Aia Compensation Calculator
Calculate the compensation for an Authorized Inspection Agency (AIA) based on project cost, inspection hours, and hourly rate.
Was this calculator helpful?
How to use this tool?
How to Use the AIA Compensation Calculator
- Enter Project Cost ($): Input the total project cost (e.g., 500000). This is informational and used for reference.
- Enter Inspection Hours: Provide the number of hours spent on inspections (e.g., 100). Use decimals for half-hours (e.g., 0.5).
- Enter Hourly Rate ($): Specify your hourly billing rate (e.g., 75).
- Enter Overhead (%): Add the overhead percentage (default is 15%). This is applied to direct labor costs.
- Click "Calculate Compensation": The calculator computes:
- Direct Labor: Inspection Hours × Hourly Rate
- Overhead: Direct Labor × (Overhead % / 100)
- Total Compensation: Direct Labor + Overhead
- View Results: The total compensation is displayed in dollars, with a detailed breakdown below.
Note: All monetary values are in USD. Ensure inputs are non-negative and overhead is between 0 and 100%.
Previous Results
| Result | Inputs | Date |
|---|
Frequently Asked Questions
It calculates the total fee for an Authorized Inspection Agency (AIA) based on direct labor (hours × rate) plus overhead percentage.
You need the project cost (optional for context), inspection hours, hourly rate, and overhead percentage.
Compensation = (Inspection Hours × Hourly Rate) + Overhead, where Overhead = Direct Labor × (Overhead % / 100).